Please use this identifier to cite or link to this item:
http://dspace.bits-pilani.ac.in:8080/jspui/xmlui/handle/123456789/11639
Title: | Lean manufacturing implementation in an automated production line: a case study |
Authors: | Sangwan, Kuldip Singh |
Keywords: | Mechanical Engineering Production rate Production levelling Value stream mapping VSM Lean manufacturing |
Issue Date: | Jun-2013 |
Publisher: | Inder Science |
Abstract: | The paper aims at improving production performance of an automated production line by lean manufacturing implementation. The production performance has been improved in an Indian industry by identifying and eliminating non-value added activities through value stream mapping. An increase in the production rate per day by 10.37%, decrease in production lead time by 10.51%, and reduction of non-value added time by 4.00% have been observed. Production levelling has been done to meet the increased customer demand without investment. The present case study will provide the managers an approach to improve productivity even in an automated production line. |
URI: | https://www.inderscienceonline.com/doi/abs/10.1504/IJSOM.2013.054883 http://dspace.bits-pilani.ac.in:8080/xmlui/handle/123456789/11639 |
Appears in Collections: | Department of Mechanical engineering |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.