DSpace logo

Please use this identifier to cite or link to this item: http://dspace.bits-pilani.ac.in:8080/jspui/xmlui/handle/123456789/11639
Full metadata record
DC FieldValueLanguage
dc.contributor.authorSangwan, Kuldip Singh-
dc.date.accessioned2023-08-24T10:18:07Z-
dc.date.available2023-08-24T10:18:07Z-
dc.date.issued2013-06-
dc.identifier.urihttps://www.inderscienceonline.com/doi/abs/10.1504/IJSOM.2013.054883-
dc.identifier.urihttp://dspace.bits-pilani.ac.in:8080/xmlui/handle/123456789/11639-
dc.description.abstractThe paper aims at improving production performance of an automated production line by lean manufacturing implementation. The production performance has been improved in an Indian industry by identifying and eliminating non-value added activities through value stream mapping. An increase in the production rate per day by 10.37%, decrease in production lead time by 10.51%, and reduction of non-value added time by 4.00% have been observed. Production levelling has been done to meet the increased customer demand without investment. The present case study will provide the managers an approach to improve productivity even in an automated production line.en_US
dc.language.isoenen_US
dc.publisherInder Scienceen_US
dc.subjectMechanical Engineeringen_US
dc.subjectProduction rateen_US
dc.subjectProduction levellingen_US
dc.subjectValue stream mappingen_US
dc.subjectVSMen_US
dc.subjectLean manufacturingen_US
dc.titleLean manufacturing implementation in an automated production line: a case studyen_US
dc.typeArticleen_US
Appears in Collections:Department of Mechanical engineering

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.