Please use this identifier to cite or link to this item:
http://dspace.bits-pilani.ac.in:8080/jspui/xmlui/handle/123456789/11723
Title: | Leanness assessment of a complex assembly line using integrated value stream mapping: a case study |
Authors: | Sangwan, Kuldip Singh |
Keywords: | Mechanical Engineering Value stream mapping Lean Complex assembly line application of lean Lean assessment Integrated VSM |
Issue Date: | May-2023 |
Publisher: | Emerald |
Abstract: | This paper proposes an integrated value stream mapping (VSM) for a complex assembly line to improve the leanness of a complex automotive component manufacturing organization. |
URI: | https://www.emerald.com/insight/content/doi/10.1108/TQM-12-2021-0369/full/html http://dspace.bits-pilani.ac.in:8080/xmlui/handle/123456789/11723 |
Appears in Collections: | Department of Mechanical engineering |
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.