dc.contributor.authorK., Pradheep Kumar-
dc.date.accessioned2023-01-17T11:12:39Z-
dc.date.available2023-01-17T11:12:39Z-
dc.date.issued2010-
dc.identifier.urihttps://ieeexplore.ieee.org/document/5447530-
dc.identifier.urihttp://dspace.bits-pilani.ac.in:8080/xmlui/handle/123456789/8529-
dc.description.abstractScheduling of tasks takes into account the priority of the tasks and the available laxity among other factors. Laxity is a measure of slack time. Generally, the available slack time is cumulated and uniformly distributed among all tasks, irrespective of priority. However, a better approach would be to distribute the slack time to tasks in proportion to their priority, giving rise to non-uniform laxity distribution. Also, these parameters may not always be specified precisely. In such situations, these parameters can be specified as approximate linguistic variables and handled through the fuzzy inference engine. Fuzzification is used as a tool to obtain the execution eligibility from the input linguistic variables. The execution eligibility is the order in which tasks are dispatched to the execution queue. Based on the execution eligibility, the tasks are scheduled. The remaining time, if available after scheduling the task, is cumulated as slack time. A task is always scheduled based on minimum execution time allotted. If a task misses its deadline due to inadequate resources, the difference between scheduled time i. e., (Arrival time + minimum execution time) and deadline is computed. If this amount of time is available in the cumulated slack, a relative deadline is set by adding the deadline to the slack needed, and the task is scheduled. If slack is not available in the cumulated slack, the task misses its deadline. The objective of this approach is to ensure that a task with higher execution eligibility does not miss its deadline, when slack time is available. The algorithm presented in this paper has been simulated on Cheddar, a real time scheduling tool, and also on SESC, an architectural simulator for multicore platforms.en_US
dc.language.isoenen_US
dc.publisherIEEEen_US
dc.subjectComputer Scienceen_US
dc.subjectPriorityen_US
dc.subjectMamdani's fuzzy inference engineen_US
dc.subjectLinguistic variablesen_US
dc.subjectRelative deadlineen_US
dc.titleMulticore real time scheduling using fuzzified priority and non-uniform laxityen_US
dc.typeArticleen_US
Appears in Collections:Department of Computer Science and Information Systems

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.