DSpace Repository

Value Network Mapping for Productivity Improvement: A Case Study

Show simple item record

dc.contributor.author Digalwar, Abhijeet K.
dc.date.accessioned 2023-09-06T10:19:21Z
dc.date.available 2023-09-06T10:19:21Z
dc.date.issued 2013
dc.identifier.uri https://www.proquest.com/openview/b876b5decaaa54f3f8b8b884b44e3e6e/1?cbl=54466&pq-origsite=gscholar&parentSessionId=WzDb28qF7%2FRc2UcrxZW5NOoqRYYy4s253Hzt6m1NGgc%3D
dc.identifier.uri http://dspace.bits-pilani.ac.in:8080/xmlui/handle/123456789/11932
dc.description.abstract The paper aims at improving the production performance of a transaxle assembly line by lean manufacturing implementation. The production performance has been increased by identifying and eliminating non-value added activities through value network mapping. To achieve maximum productivity while producing 200 pieces per shift instead of 150 pieces per shift, the assembly line will need only 13 operators instead of 17 and the productivity can be enhanced by 62.3% as compared to the current state. On the other hand, while producing 125 pieces per shift instead of 150 pieces per shift, the assembly line will need only 9 operators instead of 17 and productivity can be enhanced by 30.05% as compared to the current state. Both the production plans can be implemented with the minimum setup and changeover times en_US
dc.language.iso en en_US
dc.publisher IUP en_US
dc.subject Mechanical Engineering en_US
dc.subject Value Network Mapping en_US
dc.title Value Network Mapping for Productivity Improvement: A Case Study en_US
dc.type Article en_US


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account